{"id":15760,"date":"2026-04-08T13:48:55","date_gmt":"2026-04-08T11:48:55","guid":{"rendered":"https:\/\/ciezaentumano.com\/?p=15760"},"modified":"2026-04-09T13:50:45","modified_gmt":"2026-04-09T11:50:45","slug":"el-ceip-don-jose-marin-de-cieza-estrena-cuatro-nuevas-aulas-mas-funcionales-y-adaptadas","status":"publish","type":"post","link":"https:\/\/ciezaentumano.com\/en\/el-ceip-don-jose-marin-de-cieza-estrena-cuatro-nuevas-aulas-mas-funcionales-y-adaptadas\/","title":{"rendered":"CEIP Don Jos\u00e9 Mar\u00edn in Cieza opens four new, more functional and adapted classrooms"},"content":{"rendered":"<p>Students at the Don Jos\u00e9 Mar\u00edn school in Cieza have inaugurated four new, more functional and adapted classrooms designed for educational support. The Regional Minister of Education and Vocational Training, V\u00edctor Mar\u00edn, along with the City Councillor for Education, Mar\u00eda Turp\u00edn, and the school&#039;s principal, Pablo Pi\u00f1era, visited the new classrooms today, which will serve nearly one hundred students aged 3 to 12.<\/p>\n<p>The works involved the complete demolition of the old classrooms to create an open-plan space that allowed for a more functional layout, better suited to the school&#039;s needs, with the creation of four new classrooms. The largest classroom will be used for general education support, while the other three will be used for specialized support in therapeutic pedagogy and speech and language therapy. CEIP Don Jos\u00e9 Mar\u00edn has a total of 23 classrooms.<\/p>\n<p>The Minister of Education emphasized that \u201cthe addition of these four new classrooms reinforces the regional government&#039;s commitment to addressing diversity, providing better resources to the region&#039;s schools to offer quality education where no student is left behind.\u201d<\/p>\n<p>The investment for the comprehensive renovation and adaptation of the new spaces amounts to \u20ac75,000. Among the completed works are the installation of metalwork that improves the center&#039;s insulation, new doors, completely renovated restrooms, and the adaptation of the electrical system to current regulations, prioritizing efficiency and energy savings.<\/p>\n<p><strong>\u20ac146,000 investment in Cieza<\/strong><\/p>\n<p>The regional government has invested \u20ac146,000 in improvement works at educational centers in the municipality of Cieza. In addition to the investment made at the CEIP Don Jos\u00e9 Mar\u00edn school, it has allocated more than \u20ac38,000 to repair the heating systems at the Pedro Rodr\u00edguez school, as well as \u20ac33,000 to repair the sports court at the IES Diego Tortosa secondary school.<\/p>","protected":false},"excerpt":{"rendered":"<p>The regional government is investing 75,000 euros in adapting these spaces, which will be used for ordinary support, therapeutic pedagogy, and hearing and language support.<\/p>","protected":false},"author":1,"featured_media":15761,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[18],"tags":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts\/15760"}],"collection":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/comments?post=15760"}],"version-history":[{"count":1,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts\/15760\/revisions"}],"predecessor-version":[{"id":15762,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts\/15760\/revisions\/15762"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/media\/15761"}],"wp:attachment":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/media?parent=15760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/categories?post=15760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/tags?post=15760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}