{"id":8980,"date":"2021-02-04T02:44:57","date_gmt":"2021-02-04T01:44:57","guid":{"rendered":"https:\/\/ciezaentumano.com\/?p=8980"},"modified":"2021-02-04T02:44:57","modified_gmt":"2021-02-04T01:44:57","slug":"ciudadanos-impulsa-inicio-obras-remodelacion-parque-bomberos-cieza","status":"publish","type":"post","link":"https:\/\/ciezaentumano.com\/en\/ciudadanos-impulsa-inicio-obras-remodelacion-parque-bomberos-cieza\/","title":{"rendered":"Citizens promote the start of the remodeling work on the Cieza fire station."},"content":{"rendered":"<p align=\"justify\">The Ciudadanos party, through its Department of Transparency, Participation, and Public Administration, has initiated the construction of the Cieza fire station. The party&#039;s spokesperson in the municipality, \u00d3scar Verdejo, emphasizes that this news will lead to &quot;improved services by adapting the station to current needs.&quot;<\/p>\n<p align=\"justify\">The Cieza fire station, which has a staff of five corporals, 20 firefighters and a sergeant, also serves the municipalities of Abar\u00e1n, Blanca, Archena, Ulea, Ricote, Oj\u00f3s and Villanueva del R\u00edo Segura.<\/p>\n<p align=\"justify\">Verdejo points out that Ciudadanos has worked both at the municipal level and within the regional coalition government to ensure the renovation is completed as soon as possible. \u201cThis is a long-standing demand that has finally been met,\u201d he says. The work will be carried out in two phases. \u201cThe first phase has a budget of \u20ac350,000 and is scheduled for completion in August of this year.\u201d The building will also be furnished with new furniture. These improvements complement the acquisition of a new lightweight fire engine with water tanks of up to 2,000 liters, which was announced last December.<\/p>\n<p align=\"justify\">Source: Citizens of the Region of Murcia.<\/p>","protected":false},"excerpt":{"rendered":"<p>Ciudadanos ha impulsado, a trav\u00e9s de la de Consejer\u00eda de Transparencia, Participaci\u00f3n y Administraci\u00f3n P\u00fablica, el inicio de las obras del parque de bomberos de Cieza. El portavoz de la formaci\u00f3n liberal en el municipio, \u00d3scar Verdejo, destaca que se trata de una noticia que supondr\u00e1 \u201cla mejora de los servicios prestados adaptando el parque [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3379,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[18],"tags":[],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts\/8980"}],"collection":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/comments?post=8980"}],"version-history":[{"count":2,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts\/8980\/revisions"}],"predecessor-version":[{"id":8982,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/posts\/8980\/revisions\/8982"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/media\/3379"}],"wp:attachment":[{"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/media?parent=8980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/categories?post=8980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ciezaentumano.com\/en\/wp-json\/wp\/v2\/tags?post=8980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}